Overview:
On the slopes at KM 55 of the Ankara–Konya High-Speed Rail Line, environmental conditions such as heavy rainfall, wind, and daily temperature fluctuations have caused persistent erosion. This erosion both weakens slope stability and leads to contamination of the ballast along the track.
Challenges:
The slope surfaces had been exposed for an extended period, resulting in surface degradation due to erosion and steeper slope angles than originally designed. This situation required the application to be carried out on-site in a robust and durable manner.
Solution:
These challenges were effectively addressed through the technical advantages of FortexMat 60/60 PC Composite Brown Mat and the engineering support provided during the project:
As a result, the slopes receive long-term protection, ballast contamination is prevented, and the operation of the high-speed rail line continues without interruptions.